1

ST Cycle performance assessment for RLA effectiveness for 125 MW thermal power plant, Gujarat

2

APGCL, Namrup CCPP – Site suitability & stability study, including 6 nos. of buildings stability, Site feasibility study

3

Boiler chimney height calculation and study in line with GPCB / CPCB guidelines along with Feasibility study for process unit, Vadodara

4

Arc flash study for process unit in Nigeria

5

EPC specs, check list and documentation, Site team basic EHS orientation and training for Savli, Vadodara company for their Silvassa site team

6

Total 45 basic learning & development sessions for L&T PTI (For fresh engineers and site engineers)

7

FDG PG Test procedure and documentation review for 2 x 600 MW thermal power plant in India

8

Site survey to understand the requirement and discussion on options available for process extension, Preparation of DPR for switchgear manufacturing unit at Kutch, Gujarat

9

New area / sector identification, development of complete training programs and management system for Evolve training center, TCR Advanced Engineering

10

Review of basic documents and review of DPR for Transmission line for transmission developer based in India

11

Plant site assessment, Power generation repurposing analysis for Ninh Binh power plant, Vietnam

12

Plant site assessment, Power generation repurposing analysis for Sarani power plant, MPPGCL

13

Asset Optimization services for 1740 MW power plant for Multi national Organization, India based plant

14

3 MW Biomass based power project at Japan – Technical due diligence of the project

15

Water base bore well drilling mud handling system – Convention to Pitless method for ONGC – Mehsana and Karaikal assets on behalf of Client at Vadodara

16

Feasibility and Technical Bid specifications preparation for 700 MW CCPP at Uzbekistan

17

Learning & Development program delivery for group of Plant electrical engineers on various Plant electrical design, construction, commissioning and O&M aspects.

18

Wind Turbine OEM and their O&M services – Technical Due Diligence for India based leading WTG OEM

19

950 MW capacity Wind projects spread over 7 sites – Technical Due Diligence for Asset Acquisition funding for Indian organization

20

40 MW capacity Solar PV Project at Kutch, Gujarat – Technical Due Diligence for project funding by India’s leading Financial Organization

21

Biomass based project typical check list for Technical Due Diligence and initial Asset evaluation for UK based client

22

Green Hydrogen and Green Ammonia international project – Techno Economic Viability Study for International Lenders’ consortium

23

Review of basic documents and review of DPR for Transmission line for two different locations across India

24

Owner’s Engineering – Design and detailed engineering documents review assignment for gas based peaker power plant based at UK

25

Green Hydrogen and Green Ammonia India project – Techno Economic Viability Study / Technical Due Diligence as Owner’s Engineers

26

Wind Turbine Failure – Root Cause Analysis assignment for Gujarat based project

27

Green Hydrogen project, India – Detailed Project Report review and modification for bankable DPR study

28

Middle East based reputed Organization – Assets life cycle inspection procedures review and modifications in wake of current sector adopted practices

29

Risk Assessment for Wind projects remote operations for 2.1 GW portfolio for India based developer

30

Owner’s Engineering – Review engineering services for 440 MW solar power project (IPP) in Saudi Arabia

31

Technical assumptions and Financial model preparation for solar and BESS for gas compressor station facility at Australia

32

Lifetime evaluation report for 2.1 GW Wind projects portfolio for India based developer